all case studiesInsurance · Enterprise · 2023 · Europe
Allianz
6 weeks instead of 6 months.
A compliance integration internal teams scoped at two quarters — delivered in six weeks, NDA-bound.
6 wks
delivery vs 6mo estimate
0
production regressions
100%
audit pass
NDA
scope protected
the problem
Internal estimate for a regulated integration was six months. The business window was six weeks.
how we approached it
- Embedded pod of two senior engineers inside the internal compliance team.
- Spec, build, audit and rollout in parallel rather than sequential gates.
- Daily walk-throughs with risk and legal — zero surprises at sign-off.
the outcome
Shipped on the original window, passed first-time audit, zero post-launch incidents in the first quarter.
"Delivered a compliance integration in 6 weeks our internal team estimated at 6 months. Exceptional technical rigour."